Hitler’s Pre-Emptive War: The Battle for Norway, 1940 Henrik Lunde (general ebook reader txt) 📖
- Author: Henrik Lunde
Book online «Hitler’s Pre-Emptive War: The Battle for Norway, 1940 Henrik Lunde (general ebook reader txt) 📖». Author Henrik Lunde
The landing craft carrying the first wave of the Foreign Legion came within sight of their target area as they rounded the Øyjord Peninsula at 2355 hours. Most of the supporting fire was now directed at the area around the landing zone. The concentrated fire hit the weakest link in the German defenses, the 50-man naval artillery unit under Lieutenant Nöller. The defenders were forced to take cover and the first wave of Legionnaires landed at Ornes around 0030 hours without meeting any resistance. Group de Guittaut crossed the 70-meter wide roof of Tunnel 1 and began the climb to the top of the 1,400-foot mountain.
Lt. Nöller was seriously wounded and his men sought refuge in Tunnel 1 where they refused demands to surrender. De Guittaut left a small force to watch the tunnel while the rest of the group continued its advance. Nöller’s men capitulated later in the day after the French positioned a field gun where it could fire directly into the tunnel. Group Gilbert secured the small knoll near the railroad line by surprising its defenders (part of Nöller’s force) and the French battalion commander established his CP on the northern slope of this knoll.
The landing craft had meanwhile re-crossed the fjord to pick up the second echelon of Legionnaires at Øyjord. However, German artillery fire caused a number of casualties among the French troops and necessitated shifting the embarkation to both sides of Øyjord. This delayed the flow of reinforcements for the two groups already ashore. The Norwegian battalion was not landed until 0230 hours, about one hour behind schedule. Group Bourchet, with three rifle platoons and two tanks, which were to lead the advance into Narvik, were not embarked until 0300 hours and landed in Taraldsvik at 0345.
The delay in the buildup of forces could have jeopardized the amphibious operation but the Germans were unable to take advantage of the situation. Artillery and naval gunfire kept them under cover and many sought shelter in the railroad tunnels. Furthermore, the shelling cut communications between the various units and Haussels CP near the railroad station.
The Norwegian battalion landed without losses. Three observers accompanied the battalion commander and his staff: Fleischer, his chief of staff, and his adjutant. This was a risky act on the part of Fleischer, but it undoubtedly lifted the morale of the troops in Major Hyldmo’s battalion to see the general accompanying them into battle.
The Norwegians crossed the tunnel roof as had the French before them and began the climb, which was very steep for the first 1,200 feet. The area was narrow, with the drop-off into the Taraldsvik River valley on the right and a ravine on the left. The companies had to make the ascent one by one. Company 5 led the advance and it was to swing to the right after reaching the flatter terrain north of Hill 457 in order to give room for following units. Company 7, with a machinegun platoon attached, constituted the left wing of the battalion after reaching the more open terrain. The heavy weapons company (Co 8), the mortar platoon and Co 6, the battalion reserve, followed these two companies.
The Germans were still unable to communicate but Lieutenant Erich Schweiger, commander of Co 1, 137th Mountain Regiment, decided on his own initiative to counterattack. He gathered his unit from the shelter in a tunnel in the Djupvik area. Reinforced by a few engineers, some naval personnel, and a small number of mountain artillery troops, he moved to and occupied positions north of Hill 457. They soon found themselves in contact with Norwegians troops moving up the hillside.
The difference in French and Norwegian interpretations of the operational plan now led to difficulties. While the French understood the plan to be that Group de Guittaut should only advance against Hill 457 and secure the northern slope after the Norwegians had passed them on their right, the Norwegians understood the plan to be that they were to pass through the French forces after these had secured the northern slope of Taraldsvikfjell.4 The different interpretations of the operational plan may well have been caused by language difficulties.
The Norwegians found that the French bridgehead did not extend as far forward on the hillside above the rail line as they were led to expect in the pre-operational briefings. The Norwegians encountered heavy enemy fire, first from the flank and then from the front, as they approached the area where the two companies could spread out and where they expected to pass through the French forces.
The German troops appearing in front of the Norwegians did so as one Norwegian platoon was in the process of enveloping some Germans who were giving them problems from the flank. The Norwegians were slow in firing on the troops to their front because they believed them to be part of Group de Guittaut. The Germans opened heavy fire on the Norwegians. Several soldiers
Comments (0)